Targets and response
The plan is dated October 5, 2026. The Technical Lead measures the lot targets. The Project Manager measures spend at the end of each sprint.
- Coverage. 90% of stalls in camera view, checked for each garage and lot. If a lot falls below 90%, pause new lots and fix camera angles first.
- Accuracy. At least 90% of spots match a manual count, checked weekly. A miss gets a last-updated or stale-data warning, and expansion waits until it is fixed.
- Freshness. The newest update for a lot stays under 2 minutes for 95% of the day, checked daily. The same stale-data warning applies.
- Spend. Stay inside the $33,780 baseline, with no management reserve. Lot onboarding is not in the 538-hour estimate yet. The build-services allowance in the plan is $500.
Issue severity
- Severity 1. A filter, label, or layout glitch that does not block finding parking. Fix in the next sprint. Tell the instructor at sprint review.
- Severity 2. One lot's camera is down or stale, or the manager dashboard fails. Start within 1 business day. Include it in the next weekly update.
- Severity 3. The map or list is down, or availability is wrong for every lot. Start within the hour. Tell the instructor as soon as possible.